Fully-finished 1-Bedroom Condo Unit for Sale in Terraces at Tradizo, Imus Cavite
Anabu II-A, Imus
Terraces at Tradizo is an enclave of six (6) mid-rise condominium buildings located in the newest lifestyle capital in the South – the City of Imus, Cavite. Right off the Emilio Aguinaldo highway, Terraces at Tradizo connects you to places that matter.
Consisting of one and two bedroom units, Terraces allows its residents to relish in a thriving community close to commercial and business districts that are part of their everyday routine, while giving them a welcoming home after a hard day’s work.
A home that provides comfort and convenience, our one-bedroom units are available in 26sqm and 28sqm that’s perfect for young professionals and startup families. Turnover units come fully-finished with partitions, basic set of bathroom (toilet, shower, sink) and kitchen sink with base cabinet.
Project Location:
Terraces at Tradizo Enclave, Anabu 2A, Emilio Aguinaldo Highway, Imus Cavite
Landmarks: Yazaki, Furniture Republic, Shopwise
Nearby Establishments: The District, Shopwise, Puregold
No. of buildings: 6
No. of residential floors: 5
No. of units: ave. 20 units/floor
Selling points:
-low density condominium, more space
-prime location right off Aguinaldo highway
-establishments are all just a few minutes away, close to malls, schools, parks, groceries, banks
-spacious 1br units starting at 26sqm
-has its own amenity building complete with lounge, pool, rooftop court and multi-purpose area
Amenities: indoor pool, half court basketball, multi-purpose/family lounge area, play area, gym
Payment Terms:
For RFO Units
*3% SDP (126,000), 7% 5MTP (54,800), 6% interest, 20YTP
For Pre-Selling Units
*10k/month for the first 6months, 60k on the 7th month (inclusive of deposit) and 30k for the last 5 months (1BR) or 14,000/month for the first 6months, 84k on the 7th month (inclusive of move in deposit) and 42k (2BR) for the last 5 months DP, 6%interest, 20YTP
Reserve a unit for as low as P30k today
Inquire to know more!
HLURB LTS# 033993
Turnover Date: March 2022 (for Building B)
Year Built: 2018